Bantrel completed a FEL-3 study for the Leach, Adsorption and Detoxification circuits of Centerra Gold's Gatsuurt Project in Mongolia.
The study was based on an expected total production of 17 million tonnes (Mt) of ore, to be processed at a rate of 5,000 tonnes of ore per day (t/d) at full capacity with an estimated 10-year production life.
Services Provided
- Engineering